Valivance: bank-held funds and controlled payouts
The Platform links the UDM, cash-flow budget, Dual Electronic Acceptance and the bank API instruction. Valivance does not hold funds or certify construction quantities.
Why the traditional sequence creates a cash gap
The advance reaches the Contractor as one amount, mobilisation and procurement begin without a linked cash-flow budget, and the next payment depends on late acceptance. The methodology changes the full sequence, not merely the payment instrument.
Partner Bank
Opens and services the Protected Account, performs KYC/KYB/AML and executes or rejects the bank transaction.
Valivance
Maintains statuses, evidence and audit trail, checks digital conditions and transmits the unaltered instruction to the bank.
Customer and Contractor
The Contractor creates and accepts the request; the Customer’s Financial Controller checks cash flow, evidence and payee.
End-to-end cycle from tender to next period
Tender UDM
The Customer issues the Project template; the Contractor assigns resources and durations.
UDM and contract
Price, time, resources, cost curve and cash-flow budget become a contract schedule.
Initial funding
The Customer funds the Protected Account under the cash-flow budget.
Mobilisation
Starts the next day; mandatory 14 days; 50%/100% checkpoints on days 7/14.
Payment Request
Project ID, WBS, cash-flow line, payee, amount, tax and evidence.
Dual Acceptance
The Contractor and Customer Financial Controller approve the request. The Planning Engineer, employed by the Customer or Technical Customer, verifies its link to plan and actuals.
API and split payout
The Bank executes the approved instruction to permitted payees.
Acceptance and new cycle
Every 14 days: 80% offsets the advance; the Customer funds the next cash-flow period.
Allocation of accepted value V
Deferred 10/7/3 amounts are not current working capital. Direct costs and overhead must be fully funded through the cash-flow budget.
If a request is not accepted
The request is cancelled after 5 business days. Negotiations may take place outside the Platform, but the reason, outcome and replacement request are recorded in Valivance. Any undisputed amount is submitted separately.
Funding the next period
After documents are signed and the 80% set-off is applied, the Customer funds the next cash-flow period within 5 business days or before it starts, whichever is earlier.
Termination: refund first, external settlement second
- 1. The Customer activates “Contract Termination”; new operations are frozen.
- 2. The Bank returns the full unallocated balance to the Customer’s source account.
- 3. The parties calculate the final settlement from accepted work and retentions outside the Platform.
The Transparency Problem
In traditional construction management, funds often get stuck in long payment chains, leading to delays and contractor insolvency. Our framework replaces uncertainty with a strictly controlled Financial Circuit.
Project Default Rates: Traditional vs. Escrow-IT Model
Automated Settlement Logic
As soon as the IT platform confirms the completion of a construction milestone, the Escrow Master Account executes a "Multi-party Settlement" (Bulk Payout). This eliminates manual invoicing delays and guarantees that every participant receives their share simultaneously.
- Labor Guarantee: Subcontractors receive funds directly, preventing the misuse of funds by the General Contractor.
- Material Liquidity: Suppliers get paid upon acceptance, stabilizing the entire supply chain.
Operational Velocity
Comparing the time spent on each stage of payment routing. API automation distributes funds instantly, eliminating days of manual bank approvals.
"By automating the signal-to-payment loop, we reduce overhead time by 98% compared to manual banking."