Proprietary Risk Management Methodology

Prove the contract is executable first
Release the advance second

The methodology turns a tender offer into a Unified Digital Model and the advance into a controlled bank-held limit.Price, time, resources, cash flow and every payment operate as one mandatory sequence.

Test One Contract
ONE ADVANCE — TWO OUTCOMES

A project does not lose money at the moment of paymentBut at the moment decisions are made in the wrong sequence

The traditional model releases money first and then tries to link it to schedule and actuals.The methodology proves executability first and only then opens controlled funding.

TRADITIONAL MANAGEMENT · INDUSTRY CONTEXT

Advance first — control attempted later

0%

Proven contract executability

Price is separated from time It is impossible to prove which resources support the quoted price and schedule, and when.

50%*

Targeted use of funds

The advance should finance the work, not the Contractor’s previous cash gap

0%

Return of the unused advance

The funding requirement becomes visible only after work has begun, when the cash gap is already developing and drives the Contractor into default

PROPRIETARY METHODOLOGY · CONTROL PARAMETERS

Proven executability first — controlled payment second

100%

Proven contract executability

The Unified Digital Model combines the Estimate, Schedule, Resources, cash-flow budget and every payment in one MS Project file, operating in a single sequence

100%

Targeted use of funds

The Valivance Platform executes a payment only under an approved instruction and within the authorised cash-flow budget line

100%

Return of the unused advance

When the Works Contract is terminated, the Valivance Platform returns the entire unallocated advance balance to the Customer by bank transaction.

Price without a schedule is a number
A schedule without resources is a promise

The methodology links price, time, resources, contract terms and advance movement so the cash gap is visible before signature, not after work stops.

One UDM at tender UDM as a contract schedule Cash flow and bank controls
PRE-CONTRACT CONTROL GATE

Do not release the first advance - until six answers exist in one UDM

If even one answer exists only in a separate spreadsheet, email or Contractor promise, the Customer still cannot see whether the contract is executable.

Price without a schedule is a number.
A schedule without resources is a promise.
An advance without cash flow is unsecured credit to the Contractor.
01

What exactly is being built?

One WBS, quantities and defined contract-stage boundaries.

02

Who performs it, with what?

Crew composition, equipment, shifts and assigned resources.

03

How long does it take?

Duration supported by productivity and network logic.

04

When does funding peak?

Cost curve and maximum funding requirement.

05

How is the advance offset?

Accepted KS‑2/KS‑3 = 80% of the volume immediately, 10% after stage acceptance, 7% after acceptance of the as-built documentation and 3% after full completion.

06

Who authorises each payment?

The Customer’s Financial Controller, the Contractor’s Financial Controller and the Bank.

Before the first advance, the model must prove the contract is executable

Stage 3: Financial Security

Construction financing requires uncompromising oversight. Our Valivance Platform guarantees the safety of the Customer’s capital.

100%

Control over Advance Spending

100%

Targeted Fund Utilization

100%

Guarantee of Advance Return

The advance should fund the work - not the Contractor’s previous cash gap

Funds are held by the Bank, not Valivance. Every payment must answer three questions: for which work, to which payee and against which verified actual.

Mandatory Methodology Sequence

1. Tender Procedure

Duration: 4 Weeks

The Customer issues the UDM-MS Project template. The Contractor assigns resources and durations and forms the price, cost curve and cash-flow budget in one UDM-MS Project model.

2. Contract and mobilisation

Duration: 4 Weeks

The UDM-MS Project becomes an appendix to the contract. On the day after receipt of the first advance, the Contractor begins a 14-day mobilisation.

3. Plan–actual and payments

7 / 30 / 60 days

The Planning Engineer issues a weekly plan and enters actual physical quantities. Cyclical advance payments under the cash-flow budget are made through the Valivance Platform. Advances are cyclically offset in a future period against the preceding cash-flow budget period.

4. Advance offset and completion

80 / 10 / 7 / 3 %

Accepted KS‑2/KS‑3 = 80% of the volume immediately, 10% after stage acceptance, 7% after acceptance of the as-built documentation and 3% after full contract completion. When the Works Contract is terminated, the Valivance Platform returns the unallocated advance balance to the Customer.

NO LARGE IMPLEMENTATION TO START

Start with one tender. See the risk before contract signature.

The first review only requires the draft contract, bill of quantities, schedule and advance-payment terms.

Where price diverges from schedule and resources
When the cash gap arises and how large it is
How much of the advance may leave the controlled circuit

Construction Development LLC

Bring one tender or contract. We will identify the cash-gap point before it becomes a work stoppage and an advance-recovery dispute.